Kavango Finds High-Grade Gold

0

Kavango Resources reported high-grade gold at its Bill’s Luck Gold Mine in southern Zimbabwe, part of the Hillside Project. Drilling showed 8.05 meters of rock containing 8.09 grams of gold per tonne at a depth of 158.62 meters, with other samples confirming gold presence down to at least 160 meters. CEO Ben Turney said the results exceeded expectations and support plans to expand operations with a fourth shaft level, reinforcing the mine’s long-term potential.